• Washington University a Partner in Chouteau Greenway Development

    Washington University in St. Louis is participating in a major public-private partnership that aims to connect Forest Park to the Gateway Arch grounds. The scenic conduit — dubbed the Chouteau Greenway — likely will stretch five to seven miles...

    • Posted 6 days ago
    • 0
  • BJC Hires Dowd Bennett to Refute Roofer’s Claims

    From St. Louis Business Journal:  BJC HealthCare is seeking to quash an effort to halt its campus renewal project. Acting on behalf of the St. Louis-based health care system, Ed Dowd of Dowd Bennett LLP argued in a Sept....

    • Posted 4 weeks ago
    • 0
  • BJC Sold Former Mineral Area Regional Medical Center for $13

    From St. Louis Post-Dispatch:  Sharo Shirshekan has purchased the former Mineral Area Regional Medical Center for $13. Shirshekan, who operates nursing homes throughout the state, plans to turn the former hospital into a mental health complex that...

    • Posted 1 month ago
    • 0
  • Small W/MBE Claim at BJC North Campus Morphs to $150M Lawsuit

    by Tom Finan, Executive Director, Construction Forum STL A dispute over a few hundred thousand dollars that a W/MBE roofing contractor claims is owed her firm because of project delays on the BJC Kingshighway North Campus project...

    • Posted 1 month ago
    • 3
  • Forest Park Parkway Reopened at Kingshighway

    From St. Louis Business Journal:  The stretch of Forest Park Parkway just west of Kingshighway reopened to traffic Friday (Sept. 1) after the completion of a nine-month project to create a traditional intersection where the two roads...

    • Posted 1 month ago
    • 0
  • City Official: Upper Floors of BJC Building are ‘Buckling’

    From St. Louis Post-Dispatch:  The city building commissioner says it appears the top floors of the north tower of BJC HealthCare’s new building under construction near Kingshighway and Forest Park Avenue are “buckling,” and he is asking...

    • Posted 1 month ago
    • 0
  • Memorial, BJC to Add $32M Office Building in Shiloh

    From St. Louis Business Journal:  Memorial Regional Health Services Inc. and BJC HealthCare plan to add a second medical office building, with an estimated price tag of $32.4 million, to Memorial’s new hospital campus in Shiloh, Illinois....

    • Posted 2 months ago
    • 0
  • Safety a Top Concern for Bade Roofing on 1,200-Foot-Long, Elevated Pedestrian Connector Project

    Bade Roofing Company reported zero injuries on a challenging project that required its workers to scale a 1,200-foot-long, 13-foot-wide elevated pedestrian skywalk through one of the busiest medical campuses in St. Louis, MO. The  East-West Connector project...

    • Posted 6 months ago
    • 0
  • KAI Design & Build Completes 1,200-foot-long, Elevated Pedestrian Skywalk

    KAI Design & Build, along with Joint Venture Partner Paric Corporation, is announcing the completion of a massive 1,200-foot-long, elevated pedestrian skywalk project connecting more than 6,000 parking spaces to the main hospital complex on the BJC...

    • Posted 6 months ago
    • 0
  • Wash U/BJC Mid-Campus Center Completed

    KAI Design & Build, in a joint venture with Clayco, recently completed construction of a $100 million Mid-Campus Center for Washington University School of Medicine/BJC HealthCare as part of its billion-dollar Campus Renewal Project. KAI provided general...

    • Posted 6 months ago
    • 0